Note

When editing a price list, It is not possible to change the default rate, to change rates for activity types or to add specific rates for activity types, otherwise calculations would no longer be transparent. You have to be sure that all times logged have been priced with the rate of the price list applicable at the date you have logged work. If rates change, this can usually be reflected by setting up a new price list and modifying the validity period of the old price list.

Rules for Changing the Validity Period

When changing the validity period, the following needs to be considered (logic is that your change of the validity period can never cause an existing time entry no longer having a valid price list.):

...