Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 5.3

...

Note

When editing a price list, It is not possible to change the default rate, to change rates for activity types or to add specific rates for activity types, otherwise calculations would no longer be transparent. You have to be sure that all times logged have been priced with the rate of the price list applicable at the date you have logged work. If rates change, this can usually be reflected by setting up a new price list and modifying the validity period of the old price list.

Rules for Changing the Validity Period

When changing the validity period, the following needs to be considered (logic is that your change of the validity period can never cause an existing time entry no longer having a valid price list.):

...

You can only delete price lists if there are no work logs that have already references to the price list (=no team member has logged time for the validity period of the price list yet). In this case, the "Delete" link will automatically appear behind the price list.

Image RemovedImage Added

If y a team has no price lists any longer, you could also delete the team (see Project Teams).

...