Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Info
iconfalse

Version 2.1
Introduced structured view for the report details.
Version 2.2
Introduced the "Repair View" for the report details in case of work logs that need to be fixed as their issues had been moved between different projects.
Introduced option to create reports for all projects at once.
Introduced option to move work logs.
Introduced the option to delete, edit and move wor logs for issues with JIRA status "closed".

Focus of reporting is being able to get an idea on how much time has been spent and how much money should be charged for a project under different criteria in one reporting interface without having to switch between a couple of different reports with different templates or without having to go through a multi-step process. These reports are basically financial reports and work log reports. Reports are the base for accounting.

...