Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Info
titleiconNew Featuresfalse

Version 2.1
Introduced structured view for the report details.
Version 2.2
Introduced the "Repair View" for the report details in case of work logs that need to be fixed as their issues had been moved between different projects.
Introduced option to create reports for all projects at once.
Introduced option to move work logs.

Focus of the ictime reporting is being able to get an idea on how much time has been spent and how much money should be charged for a project under different criteria in one reporting interface without having to switch between a couple of different reports with different templates or without having to go through a multi-step process. These reports are basically financial reports and work log reports. Reports are the base for accounting.

...

CriteriaDescriptionRemarks
Projectproject dropdownonly Project dropdown, you have to select one project or "All projects" (but it is not possible to select multiple projects).Only projects in ictime project status "active" or "inactive" appear in the list, you have to select one project.
Dateenter Enter date from, to.leave Leave blank to get all entries, limit the date range by entering "from" and "to" or just enter either "from" or "to" to define start or end of the date range
Statuswork Work log status: non charged, charged, all.default Default is "non charged".
Prepare Charging Entries

if If you check this, functionality for creating an "invoice" will be available; you can't combine that with choosing the work log status "charged" or "all" (if there are entries already charged in your results).

see See Accounting.
Componentcomponent Component dropdown for selected project (multi-select) .Not available if you have selected "All projects".
Versionfix Fix version dropdown for selected project (multi-select).Not available if you have selected "All projects". Note that this is "fix for version" (not "affected version").
Teamteam Team dropdown for selected project (multi-select) .Not available if you have selected "All projects".
Useruser User dropdown for selected project (multi-select).

All users assigned to teams of this project; will be empty if there are no users assigned to teams (e.g. historic data), in this case you can't analyse by users, but can still run the report.

If a project has been configured not to use teams/price lists, the dropdown will be filled with all users that have "browse project" permissions in JIRA for the respective project. Same is the case if you have selected "All projects", the list will show all users that have "browse project" permission for at least one of the projects.

Activity Typeactivity Activity type dropdown (multi-select).all All activity types. There is no filtering according to the Project Activity Types.
Info

The project dropdown is not filtered according to JIRA browse project permissions or project-team membership of the current user. We assume that the ictime permission to use the reporting interface includes the permission to see all projects in ictime, regardless of JIRA configuration or team memebership. However, you might be restricted regarding what you see and what you can do in the work log details list if you are running a report for a project where you do not have browse project permissions or are not team member.

Tip

As  general behaviour in this filter/search mask, if you don't select entries from a dropdown (multi-selectbox), this is considered as having selected "all".

Display Options

If "Work Logs

...

If " is checked (= default setting), the report shows all work logs and not only a (financial) summary.

...

All reports automatically include the (financial) summary. These There are the two options for this summary:

OptionDescriptionRemarks
RoundingRounded, Exactapply Apply rounding rule/s or display exact results, if applicable.default: rounded; see Rounding Rules
Team Viewdisplay; currently, only team view is available(other views in preparation)

...

The list shows 15 entries per page and has a following page navigation.

Edit

...

Work Logs

You can edit, move or delete time entries work logs appearing in your report result list. Click on the respective icons:.

Image Removed 

Export Work Log Details

You can export the work log details via the respective buttons on top/bottom of the list as Excel-compatible file.

...

Structured View

The structured view display displays your work log logs grouped by project and issue and shwos the total time on project and issue level (according to the search criteria of the report). 

Fields/columns and operations are the same like for the list view (see table above).

...